联系我们收藏本站在线留言网站地图欢迎进入唐山天物彩板集团有限公司官网!

彩板厂家_彩涂板价格_彩涂卷厂家_彩涂板价格_天物集团

天物彩板-始于2004 专注功能性高端彩板生产销售
服务热线: 400-060-9166
服务热线: 13931586578
彩板厂家

安装印花彩涂板常用的步骤方式

返回列表 来源: 发布日期: 2019.10.21

安装印花彩涂板常用的步骤方式

天物彩板专注高端定制彩板——更多印花彩涂板安装配送_山东印花彩涂板定制_天物彩板请拨打网站上方电话咨询

印花彩涂板安装配送_山东印花彩涂板定制

我们需要在安装印刷彩色涂层板之前准备好设备,这样我们更好的设备不会耽误工作效率。准备好后,我们需要按流程操作设备。设备的详细流程是什么?东/西/材料:机房彩钢板、正角片、负角片、扣件、钢筋、75型轻钢龙骨、螺钉、扣件。程序/方法1。根据地图面和外业测量比例尺(分界线中心线)放线,在两侧中心线与地面相交处弹出地球轨道中心线。应确保四条线在一个直线平面上,以确保将来安装的墙壁是直线的。
天井:设备应整齐,每500mm-600mm用螺栓或螺钉将接缝固定在水泥天棚上。地轨:安装地轨时,应事先预留门的方位,并注意地差。如果地板上的凹凸差过大,请调平以减小差异,而不影响调整水平。每隔600毫米,就应该敲打或拧动它来固定地板。如果地板接缝太大,应填充密封胶。
封边:根据实际测量值,先切边,再切边。争取共同的规则和无缝连接。特别注意与天际线和踢脚板的连接,做到无缝。竖龙骨:每49cm(隔墙尺寸的一半)放置一根竖龙骨。门框两侧立柱上下完全固定,避免摇晃。竖龙骨的添加方向相反。门扇的宽度超过90厘米。必要时,对水平柱进行焊接加固,并固定在门框上。
十字芯龙骨:增加3m以上,沿1.2m设置一根,当两个接缝需要堆放时,堆放长度不应小于10cm。墙板:彩钢板按顺序一端安装,连接板间距为12mm。隔墙间选用12mm宽墙板,可换标准单元墙板

We need to prepare the equipment before installing the printed color coating board, so that our better equipment will not delay the work efficiency. After the preparation, we need to operate the equipment according to the process. What is the detailed process of the equipment? East / West / material: machine room color steel plate, positive angle piece, negative angle piece, fastener, steel bar, 75 type light steel keel, screw, fastener.Procedure / method 1. Set out according to the map surface and field survey scale (dividing line center line), and pop up the earth orbit center line at the intersection of the center lines on both sides and the ground. It shall be ensured that four lines are on a straight plane to ensure that the walls of the installation will be straight in the future.

Patio: the equipment shall be neat, and the joint shall be fixed on the cement ceiling with bolts or screws every 500mm-600mm. Ground rail: when installing the ground rail, the orientation of the door shall be reserved in advance, and attention shall be paid to the ground difference. If the bump difference on the floor is too large, level to reduce the difference without affecting the adjustment level. Every 600mm, it should be knocked or screwed to fix the floor. If the floor joint is too large, it should be filled with sealant.
Edge closing: according to the measured value in practice, cut the edge, and then cut the edge. Strive for common rules and seamless connection. Pay special attention to the connection with the skyline and kick board to achieve seamless. Vertical keel: place one vertical keel every 49cm (half of the size of partition wall). The columns on both sides of the door frame are completely fixed up and down to avoid shaking. The vertical keel is added in the opposite direction. The width of the door leaf is more than 90cm. If necessary, the horizontal column shall be strengthened by welding and fixed on the door frame.
Cross core keel: add more than 3m, and set one along the 1.2m. When two joints need to be stacked, the stacking length shall not be less than 10cm. Wallboard: color steel plate shall be installed at one end in sequence, and the spacing between connecting plates shall be 12mm. 12mm wide wallboard shall be selected between partition walls, and standard unit wallboard can be exchanged.

咨询热线

400-060-9166